terra infrastructure provided installation equipment and sheet pile to Teras Australia for the upgrade of their Marine barge terminal located at East Arm Darwin NT.
The project included 387 x sheets of Larssen L720 sheetpile at a length of 10m, for the construction of the 232Lm wall.
Installation was carried out by Advance civil utilising terra infrastructure’s ABI 14/18 Piling Rig to set and drive the piles, then using a BSP CX110 impact hammer to back drive to the required depth.

you might also be interested in
-
Linear Shoring in use for Major Munich Project
In order to relieve the existing sewer system, a new 2.2 kilometre long DN 3000 sewer was driven in Landsberger Straße using the pipe jacking method.
To the post -
E+S Linear Shoring: Sewer Rehabilitation Work in Leipzig
The main components of the project included the construction of a storage channel with bottom relief made of semi-prefabricated parts in panel construction.
To the post -
Clear view: glass panels in Neufelderkoog
Here, a flood protection barrier including glass elements protects the inhabitants and visitors from storm tides. The glass breaks up the appearance of the approximately 800 meters long flood defence wall.
To the post