DRESDEN-GHOLIS FLOOD PROTECTION SYSTEM.
In the years 2002 and 2013, the Gohlis district of Dresden was completely flooded by the river Elbe. To permanently protect this part of town, we installed a complete flood protection system which at the same time provides access to the meadows along the Elbe.
On sheet piling with a foundation of drilled piles, a massive concrete and stone wall was erected, fitted partly with demountable 200 x 100 tk stop logs. These have to withstand very high impact loads – up to 50 kilonewtons per 50 x 50 centimeters. In accordance with DIN 19712, double closures were provided for crossings and passages. The protective wall is around 880 meters long, with barrier heights of 2 meters and 0.60 meters.
To store the demountable flood protection system, we designed special pallets that can be loaded and unloaded using a forklift truck, wheeled loader, or mobile crane.
you might also be interested in
-
Rehabilitation of a Landfill
For groundwater capture, the landfill was provided with sheet pile walls, which were coated on both sides and provided with a permanent interlock seal.
To the post -
Linear Shoring provides Working Space in XXL
With E+S linear shoring, a shoring system from terra infrastructure was used to secure the excavation pits. This has paid off in many respects.
To the post -
Protecting valuable history with terra stop log system
In a major project here in the hinterland of the Elbe, a combination of a new earth embankment and strengthening of the protective measures by means of demountable stop log elements has been realised.
To the post