DRESDEN-GHOLIS FLOOD PROTECTION SYSTEM.

In the years 2002 and 2013, the Gohlis district of Dresden was completely flooded by the river Elbe. To permanently protect this part of town, we installed a complete flood protection system which at the same time provides access to the meadows along the Elbe.

On sheet piling with a foundation of drilled piles, a massive concrete and stone wall was erected, fitted partly with demountable 200 x 100 tk stop logs. These have to withstand very high impact loads – up to 50 kilonewtons per 50 x 50 centimeters. In accordance with DIN 19712, double closures were provided for crossings and passages. The protective wall is around 880 meters long, with barrier heights of 2 meters and 0.60 meters.

To store the demountable flood protection system, we designed special pallets that can be loaded and unloaded using a forklift truck, wheeled loader, or mobile crane.


you might also be interested in

  • Back anchoring steel sheet pile wall with micropiles

    On the north bank, an armored steel sheet pile wall was to be placed in front of the existing seawall over a length of around 400 meters and tied back at specified points.


    To the post
  • Trenchless Crossing

    New laying of an underground power line from the central substation to the north substation closes the inner-city power line network and increases the security of supply in the urban area.


    To the post
  • Offshore work in the Juri Korchagin oil field in Russia

    The Juri Korchagin oil field is located in the northern part of the Caspian Sea. There, the Lukoil company wanted to build an ice-resistant drilling platform consisting of two blocks.