PARKING GARAGE RETAINING WALL - CONSTRUCTION OF A PARKING GARAGE

PARKING GARAGE RETAINING WALL - CONSTRUCTION OF A PARKING GARAGE

Within the scope of this construction project, a retaining wall made of anchored LARSSEN steel sheet pile sections was provided, as this was required for the up to 10.30 m deep terrain slopes.

A multi-storey parking lot was to be built on the site of the thyssenkrupp Quarter in Essen. As the ground had up to 10.30-meter-deep slopes, permanent ground stabilization was necessary. In coordination with thyssenkrupp Real Estate GmbH, the executing construction company decided in favor of a retaining wall made of anchored LARSSEN steel sheet pile sections. A total of 720 tons of LARSSEN 606 n in lengths of up to 14.30 meters were installed.

Data & Facts

Sheet Pile Dilevery
approx. 720 t LARSSEN 606 n in grade S 355 GP in lengths up to 14.3 m
Lock Seal
approx. 5,200 m interlock seal system HOESCH
Corrosion protection/coating
approx. 4700 m² sheet pile coating, Hartmann Bautenschutz, Dortmund
Equipment and anchoring material
320 m waling 2 U 400, anchor plates, bolts, 320 m edge protection, anchor plate waling, 78 pieces ASF round steel anchors, 3" and 3 ½" up to 14 m long, ASF anchors, Anton Schmoll GmbH Verbindungstechnik, Balve
Client
thyssenkrupp Real Estate GmbH, Essen
Testing
API Asmus + Prabucki Ingenieure Beratungsgesellschaft mbH, Essen
Executing Construction Company
ARGE thyssenkrupp Quartier TB, Bottrop; Heinrich Walter Bau, Borken; Eurovia Teerbau GmbH, Bottrop; G. Papenburg AG, Schwarmstedt, Grundbau Jansen GmbH, Linnich
Execution Planning
ECE; API Asmus Prabucki Ingenieure, Essen; thyssenkrupp Infrastructure GmbH, Essen
Testing
Ing. Büro Hamelmann Karvanek, Essen

you might also be interested in

  • Trenchless Crossing

    New laying of an underground power line from the central substation to the north substation closes the inner-city power line network and increases the security of supply in the urban area.


    To the post
  • Just-in-Time Delivery for a Bridge Abutment

    A new bridge for overpassing the A3 freeway was built at the Offenbach junction. There were a total of three excavation pits for this new construction.


    To the post
  • Flood Protection in Fargo, North Dakota, USA

    The city of Fargo is located on the Red River, which repeatedly flooded existing flood defences and roads during the winter months.


    To the post