Referenz AUS Hollow Bars

Achor and Micropile Technology - Hollow Bars

HOLLOW BARS IN WESTERN AUSTRALIA

HOLLOW BARS IN WESTERN AUSTRALIA.

At the beginning of 2018, terra infrastructure started the supply of the tk-R Hollow bar system to our client, Belpile, for the first time in Western Australia.

tk-R Hollow bars provided an effective, efficient solution, anchoring a CFA pile wall. The four storey excavation involved three rows of anchors ranging from 19.5m to 6m long, on the last row.

For this job the tk-R38A was selected and was supplied in 3m sections. terra infrastructure supplied all associated components of the hollow bar system including plates, nuts, couplers and centralisers as well as two different sizes of drill bits, 90mm and 115mm hardened cross bits (EX).

The remainder of this order was completed in mid-March 2018, bringing the final number of bars sold into this project to 1,470 pieces.

An interesting sidenote to the installation was that the tk-R Hollow bars were installed by an anchoring rig, not owned by terra infrastructure that was equipped with a terraHB35A Drifter.

Using the terra built drifter, a maximum of 20 anchors per day (140 bars) was achieved. This is yet another example of the complete, In-ground solution that terra infrastructure can provide.

you might also be interested in

  • Stokes Hill Wharf Fender Piles

    terra infrastructure supplied both our müller MS32HFV vibro and BSP CX110 impact hammer to Advance Civil and Engineering to install 22 x 32m long fender piles on their Stokes Hill Wharf upgrade.


    To the post
  • Pile Driving in Schwerin

    Extensive construction work was carried out on the grounds of the Schwerin Water Police Station on the Swan Peninsula to extend the breakwater.


    To the post
  • Flood Protection along the railway line in Minnesota

    A railway line that crosses the Chippewa River, Minnesota is regularly affected by flooding and should be provided with flood protection.


    To the post