STOKES HILL WHARF FENDER PILES.
MÜLLER MS32 HFV Crane suspended vibro and BSP CX110 Impact Hammer
terra infrastructure supplied both our müller MS32HFV vibro and BSP CX110 impact hammer to Advance Civil and Engineering to install 22 x 32m long fender piles on their Stokes Hill Wharf upgrade.
The piles were set with the vibro and back driven with the impact hammer to a depth of 6m into the sea bed.
you might also be interested in
-
Floor Renovation in a New Dimension in Ingolstadt
When carrying out the honeycomb process, the experts resorted to the idea of attaching a free-riding MÜLLER MS-40 HFV vibratory machine from terra infrastructure to a Liebherr carrier machine.
To the post -
Linear Shoring provides Working Space in XXL
With E+S linear shoring, a shoring system from terra infrastructure was used to secure the excavation pits. This has paid off in many respects.
To the post -
Linear Shoring in use for Major Munich Project
In order to relieve the existing sewer system, a new 2.2 kilometre long DN 3000 sewer was driven in Landsberger Straße using the pipe jacking method.