Header green

Steel Sections - Sheet Piling

THE WENTWORTH POINT MARINAS PROJECT

THE WENTWORTH POINT MARINAS PROJECT.

We are proud to announcement our collaboration with one of Sydney’s largest developers. The Wentworth Point Marinas Project is made up of four apartment complexes with a combined worth of US$308.5 Million which will completely transform Wentworth Points foreshore.

terra infrastructure was in on the ground floor, providing a cost effective lightweight sheet pile in the SCH-5, which was used for the basements cantilevered walls and lift pits. The STU-8 and STU-1000 was also utilized for its ability to re-drive over and again. When it came to installation, Billbergia required a MÜLLER MS-7 HFB excavator mounted vibro hammer along with a gooseneck to fit on to their 20 ton excavator in order to drive these sheets. As 8m was the regular sheet length, terra infrastructure fabricated a gooseneck to give the hammer the required clearance.

you might also be interested in

  • Flood Protection for the Yuyao Community in China

    In the municipality of Yuyao, the Yuyao River was equipped with mobile flood protection along a length of about 4,700 metres to improve the quality of life of the citizens.


    To the post
  • Linear shoring ensures large and safe working space

    Zur Sicherung der Baugrube und zur Erstellung des Sammlers verwendet das Unternehmen den gestuften Linearverbau von E+S.


    To the post
  • Slope stabilization by sheet pile wall

    Die Schwergewichtsmauer in der Gennerstraße in Hürth sollte im Frühjahr 2018 durch eine mit L-Steinen verkleidete Spundwand ersetz werden. Für die ausführende Baufirma übernahmen wir..


    To the post