We are proud to announcement our collaboration with one of Sydney’s largest developers. The Wentworth Point Marinas Project is made up of four apartment complexes with a combined worth of US$308.5 Million which will completely transform Wentworth Points foreshore.

terra infrastructure was in on the ground floor, providing a cost effective lightweight sheet pile in the SCH-5, which was used for the basements cantilevered walls and lift pits. The STU-8 and STU-1000 was also utilized for its ability to re-drive over and again. When it came to installation, Billbergia required a MÜLLER MS-7 HFB excavator mounted vibro hammer along with a gooseneck to fit on to their 20 ton excavator in order to drive these sheets. As 8m was the regular sheet length, terra infrastructure fabricated a gooseneck to give the hammer the required clearance.

you might also be interested in

  • Trenchless Crossing

    New laying of an underground power line from the central substation to the north substation closes the inner-city power line network and increases the security of supply in the urban area.


    To the post
  • Safety in a double pack in Berlin-Frohnau

    It was an excavation support of record-breaking dimensions - all construction partners involved in the sewer rehabilitation project in Berlin-Frohnau agreed on this.


    To the post
  • Demountable flood protection with the terra stop log system

    A reinforced concrete plinth and a demountable flood protection wall will prevent flood-waters from threatening the building in future.


    To the post