REHABILITATION OF A LANDFILL

The Brandheide landfill is located on the city limits of Dortmund. It was used between 1959 and 1972 for the disposal of household waste, construction waste and tar sludge. To capture groundwater, the landfill was provided with an approximately 800-meter-long cut-off wall with sheet piles in lengths of up to 10.50 meters. To ensure long-term water protection, we executed the sheet pile walls with a coating on both sides and a durable interlock seal.

you might also be interested in

  • Just-in-Time Delivery for a Bridge Abutment

    A new bridge for overpassing the A3 freeway was built at the Offenbach junction. There were a total of three excavation pits for this new construction.


    To the post
  • Dresden: protecting the historic heart of the city

    As a consequence of the flood disaster, Dresden is reinforcing its flood protection in the areas at risk. Extensive building work was carried out between 2006 and 2011.


    To the post
  • Foundation for first nuclear power plant in Bangladesh

    In Ruppur, about 180 kilometres west of the capital Dhaka, the first national nuclear power plant is to secure Bangladesh's energy supply from the end of 2023.


    To the post