Temporary Flood Protection - terra stop log system

DRESDEN-GHOLIS FLOOD PROTECTION SYSTEM

DRESDEN-GHOLIS FLOOD PROTECTION SYSTEM.

In the years 2002 and 2013, the Gohlis district of Dresden was completely flooded by the river Elbe. To permanently protect this part of town, we installed a complete flood protection system which at the same time provides access to the meadows along the Elbe.

On sheet piling with a foundation of drilled piles, a massive concrete and stone wall was erected, fitted partly with demountable 200 x 100 tk stop logs. These have to withstand very high impact loads – up to 50 kilonewtons per 50 x 50 centimeters. In accordance with DIN 19712, double closures were provided for crossings and passages. The protective wall is around 880 meters long, with barrier heights of 2 meters and 0.60 meters.

To store the demountable flood protection system, we designed special pallets that can be loaded and unloaded using a forklift truck, wheeled loader, or mobile crane.


you might also be interested in

  • Pile Driving in Permafrost

    The absolute advantage of our equipment under permafrost conditions: terra machines did not require any preheating, as they were already designed for the extreme conditions ex works.


    To the post
  • Brought in ice-cold.

    Two MS-210 HHF and two MS-240 HHF vibratory units were used for driving steel pipes into the permafrost for the port in Western Siberia.


    To the post
  • Rain Overflow Basin in Chemnitz

    Renovation of sewer, electricity, gas, drinking water, lighting and communication and construction of a storm water overflow structure in the area of the traffic junction.


    To the post