PARKING GARAGE RETAINING WALL - CONSTRUCTION OF A PARKING GARAGE
Within the scope of this construction project, a retaining wall made of anchored LARSSEN steel sheet pile sections was provided, as this was required for the up to 10.30 m deep terrain slopes.A multi-storey parking lot was to be built on the site of the thyssenkrupp Quarter in Essen. As the ground had up to 10.30-meter-deep slopes, permanent ground stabilization was necessary. In coordination with thyssenkrupp Real Estate GmbH, the executing construction company decided in favor of a retaining wall made of anchored LARSSEN steel sheet pile sections. A total of 720 tons of LARSSEN 606 n in lengths of up to 14.30 meters were installed.
Data & Facts
Sheet Pile Dilevery
approx. 720 t LARSSEN 606 n in grade S 355 GP in lengths up to 14.3 m
Lock Seal
approx. 5,200 m interlock seal system HOESCH
Corrosion protection/coating
approx. 4700 m² sheet pile coating, Hartmann Bautenschutz, Dortmund
Equipment and anchoring material
320 m waling 2 U 400, anchor plates, bolts, 320 m edge protection, anchor plate waling, 78 pieces ASF round steel anchors, 3" and 3 ½" up to 14 m long, ASF anchors, Anton Schmoll GmbH Verbindungstechnik, Balve
Client
thyssenkrupp Real Estate GmbH, Essen
Testing
API Asmus + Prabucki Ingenieure Beratungsgesellschaft mbH, Essen
Executing Construction Company
ARGE thyssenkrupp Quartier TB, Bottrop; Heinrich Walter Bau, Borken; Eurovia Teerbau GmbH, Bottrop; G. Papenburg AG, Schwarmstedt, Grundbau Jansen GmbH, Linnich
Execution Planning
ECE; API Asmus Prabucki Ingenieure, Essen; thyssenkrupp Infrastructure GmbH, Essen
Testing
Ing. Büro Hamelmann Karvanek, Essen
you might also be interested in
-
Pile Driving in Schwerin
Extensive construction work was carried out on the grounds of the Schwerin Water Police Station on the Swan Peninsula to extend the breakwater.
To the post -
Plastic Construction Road in Tübingen
For the protection of the hospital grounds, the company used the plastic construction road to optimally protect the paved access road to the installation site as well as the surrounding park and meadow areas.
To the post -
Pile Driving in Permafrost
The absolute advantage of our equipment under permafrost conditions: terra machines did not require any preheating, as they were already designed for the extreme conditions ex works.
To the post