GLASS WALL AT THE TURMSCHANZENSTRASSE AREA, MAGDEBURG.
The major flood protection upgrade program in Magdeburg also included the areas to the east of the Elbe. To maintain the view of the river in the Turmschanzenstrasse area, we installed glass walls at various points consisting of individual glass panels in different sizes. Special feature: The thickness of each glass panel was matched to the different impact loads. On the river-facing side exposed to very high loads, glass thicknesses of up to 76 millimeters were used; on the side facing away from the river the panes are significantly thinner. This made the overall solution extremely cost-efficient. A further highlight of the project is our manually operated fold-up aluminum panel providing access to the river bank. Measuring 3.00 x 0.80 meters, it is made of checker plate to give vehicles driving over it increased grip. It also operates on a completely mechanical basis – no electricity or machinery is required – and can be mounted and dismantled by two people.
you might also be interested in
-
Trenchless Crossing
New laying of an underground power line from the central substation to the north substation closes the inner-city power line network and increases the security of supply in the urban area.
To the post -
New Embankment For Logport II in Duisburg
Due to the growing demand of the logistics industry, a new logistics center was established in the Port of Duisburg - Logport II. A new embankment was built over a length of 360m.
To the post -
Just-in-Time Delivery for a Bridge Abutment
A new bridge for overpassing the A3 freeway was built at the Offenbach junction. There were a total of three excavation pits for this new construction.
To the post