PLASTIC SITE ROAD.
- TEMPORARY ROAD
- LOW WEIGHT, HIGH LOAD CAPACITY
- QUICK ASSEMBLY AND DISMANTLING
Fast, safe and economical: our plastic construction road is easy to lay, ensures optimum load distribution and can be used on almost any surface. It is also a real lightweight - and transport costs are correspondingly low. It is suitable for construction site access roads, road widening or storage areas, as well as a crane and assembly platform. Thanks to its width, it can be driven on by any type of lorry.
KEY DATA
Material:
High-density polyethylene
Characteristics:
- Dimensions: 3,000 x 2,400 x 45 mm (also available as a variant for steel tracked vehicles)
- Weight: 285 kg/panel
- Load capacity up to 200 tonnes
- Max. Max. speed 10 km/h
ADVANTAGES
- Low weight, but high load capacity
- Simple installation
- High installation speed
- No special vehicles required
- Secures and protects the substrate
- Cost-effective alternative to other temporary road systems
- Safe and economical



STEEL CONSTRUCTION ROAD.
Our E+S steel site road system provides great freedom of mobility as well as a host of technical options and broad scope for cutting costs. The site road consists of heavy-duty angles laid lengthwise and special profiles laid crosswise. Its simple design and special connectors make installation a very straightforward matter. The speed of laying is relatively high, as an excavator lifts the elements one after another from a reversing truck. The sections are then connected together with straps.
SPECIFICATIONS
- Dimensions: 2.340 mm x 3.800 mm x 160 mm
- Weight: 869 kg
- Load: 12 t axle load
- For highest load requirements
- Protection of the subsoil for temporary construction site access roads
- No special vehicles required for delivery and removal
- Can be laid without earthworks
- Simple installation
- Use of the construction road in flooded areas possible
reference projects

Plastic Construction Road
Plastic Construction Road at the University Hospital in Tübingen
Read moredownloadcenter

contact person
Nicole Wehrle
Productmanager Trench Shoring
+49 172 1736227
nicole.wehrle@terra-infrastructure.com