LANDFILL REMEDIAL WORKS
Sheet piles were driven into the landfill to collect groundwater. These were coated on both sides and provided with a durable sealant.
CHEMNITZ RAINWATER OVERFLOW SEWAGE TREATMENT PLANT
Remedial works on all media such as sewer, current, gas, drinking water, lightning and communication and construction of a rainwater overflow structure in the area of the traffic junction.
RIVER BANK REINFORCEMENT ON THE MORITIZBACH CREEK IN ZWICKAU
On a length of about 530 meters, the protective walls were reinforced and heightened.
FEED CONVEYOR
Old shafts were uncovered and demolished, and in the course of laying the new pipeline, the original structures were replaced by new shaft structures made of reinforced concrete prefabricates.
LINEAR SHORING ENSURES A LARGE AND SAFE WORKING AREA
The company is using E+S staged linear shoring for the safety of the construction pit and for the construction of the collector.