The Brandheide landfill is located on the city limits of Dortmund. It was used between 1959 and 1972 for the disposal of household waste, construction waste and tar sludge. To capture groundwater, the landfill was provided with an approximately 800-meter-long cut-off wall with sheet piles in lengths of up to 10.50 meters. To ensure long-term water protection, we executed the sheet pile walls with a coating on both sides and a durable interlock seal.
you might also be interested in
-
Brought in ice-cold.
Two MS-210 HHF and two MS-240 HHF vibratory units were used for driving steel pipes into the permafrost for the port in Western Siberia.
To the post -
90 seconds for 1 meter of security
The new system is characterized by its fast installation without the need for special training. One meter of safety “grows” every 90 seconds.
To the post -
Foundation for first nuclear power plant in Bangladesh
In Ruppur, about 180 kilometres west of the capital Dhaka, the first national nuclear power plant is to secure Bangladesh's energy supply from the end of 2023.
To the post