Stop log system railroad minnesota

Temporary Flood Protection - terra stop log system

FLOOD PROTECTION ALONG THE RAILWAY LINE IN MINNESOTA.

FLOOD PROTECTION ALONG THE RAILWAY LINE IN MINNESOTA.

Flooding along the Chippewa River, a tributary of the Minnesota River in Montevideo, occurs more rapidly than expected, especially after heavy winter snowfall and spring snowmelt. In addition, ice jams upstream cause rapid flows in Montevideo. Flooding then particularly affects areas that are in the immediate vicinity of the river and on the west side of the dike.

Within the affected area, there is also a railway line that crosses the Chippewa River. This is regularly affected by flooding and should be provided with flood protection. The challenge was to devise a solution that could be integrated into the existing system of sheet piling, concrete wall and the tracks and protect the buildings and businesses in front of it from flooding by the river. The train track had to remain passable for trains and should only be sealed in the event of a flood.

This opening is sealed over a width of 6 metres and a height of 2 metres, which conventionally would actually have to be solved by several bays with central posts and anchor plate foundations due to the forces that occur. Due to the existing tracks - no structural changes were possible here - this project seemed difficult to realise.

With the support of the experts in the technical office, terra infrastructure developed a special solution for this. It consists of modified 6-metre-long dam beams that can withstand the water in the event of a disaster. These fulfil all static requirements. For this project, existing 250x150 dam beams were individually reinforced with welded-on plates.

For the future, Montevideo is also optimally protected against flooding in the area of the tracks at the river crossing.

you might also be interested in

  • New Embankment For Logport II in Duisburg

    Due to the growing demand of the logistics industry, a new logistics center was established in the Port of Duisburg - Logport II. A new embankment was built over a length of 360m.


    To the post
  • Pile Driving in Schwerin

    Extensive construction work was carried out on the grounds of the Schwerin Water Police Station on the Swan Peninsula to extend the breakwater.


    To the post
  • Pioneering achievement on the high seas

    This marks the beginning of a new era in wind energy. The first German wind farm, “alpha ventus”, has been built in 30 meters of water some 45 kilometers north of the island of Borkum.


    To the post