In the provincial capital of Badajoz, located in the west of Spain, COPISA Constructora Pirenaica is realizing a good 800 meters long collector and several rainwater retention basins. The work, commissioned by the Ministry of Agriculture, Food and Environment, has a volume of almost 13 million euros and the projected construction time is nine months. To secure the excavation pit and construct the collector, the company is using the stepped linear shoring system from E+S, a terra infrastructure product brand.
A decision that pays off not only in terms of safety: In particular, the use of the so-called U-type roller units and the possibility of moving them in height according to the manufacturer's specifications ensures the necessary working space when laying the pipes with large nominal diameters.
Primarily due to forecasts on the development of the number of inhabitants in the large city of Badajoz, the performance of the central wastewater system was to be increased in the long term. There was also a need for action with a view to future heavy rainfall events. Two rainwater retention basins with a capacity of 20,000 cubic meters are to ensure that the necessary capacities will be available in the future. In addition, a new DN 2000 collector will be laid over a length of 815 meters. The 5 to 6 meter deep excavation pit with a clear width of 2.75 meters is secured by stepped linear shoring.
Large working space
In Badajoz, a total of 18 modules of the shoring system, each 4 meters long, are used. The use of the U-type roller unit ensures maximum clearance height and thus the greatest possible flexibility on the construction site. The component has excellent static properties and is extremely resilient. Depending on requirements, the roller unit can be moved steplessly in different construction phases in accordance with the static specifications.
Due to its U-shaped design - enormous cantilever lengths are possible - the roller unit makes very large pipe clearance heights possible. This results in many technical and economic advantages for the equipment and vehicles used on the construction site during the installation and removal of the shoring and when working in the excavation pit.
In any case, the construction partners are unanimous in their verdict on the shoring system used: Both the system itself and the good technical advice provided on site helped to reduce costs on the construction site.
Data & Facts
you might also be interested in
-
Flood Protection along the railway line in Minnesota
A railway line that crosses the Chippewa River, Minnesota is regularly affected by flooding and should be provided with flood protection.
To the post -
Clear view: glass panels in Neufelderkoog
Here, a flood protection barrier including glass elements protects the inhabitants and visitors from storm tides. The glass breaks up the appearance of the approximately 800 meters long flood defence wall.
To the post -
Floor Renovation in a New Dimension in Ingolstadt
When carrying out the honeycomb process, the experts resorted to the idea of attaching a free-riding MÜLLER MS-40 HFV vibratory machine from terra infrastructure to a Liebherr carrier machine.
To the post