OFFSHORE WORK IN THE JURI KORCHAGIN OIL FIELD IN RUSSIA.
The Juri Korchagin oil field is located in the northern part of the Caspian Sea. There, the Lukoil company wanted to build an ice-resistant drilling platform that would consist of two blocks: the production facility and the accommodations. In order to ram the foundation pipes with an outer diameter of 84 inches (2,134 millimetres) and a length of up to 71 metres, our client needed a powerful machine with a powerful crane and grab unit. Only with this was it possible to grab the pipes lying on their side and also hold them during the erection - because this process requires a high and stable tension.
After a detailed consultation, we came up with the ideal solution together with the customer: We rented him a MS-240 HHF vibrator unit in combination with an MS-A 1150 V power pack. On the construction site, the vibrator was placed on its side. Then the pipes were gripped on the side, set up and placed in a so-called conductor. This pile-driving guide prevents the pipes from slipping when they are positioned. Afterwards, they were first brought to a low pile-driving depth with a vibrator and then driven in with a hydraulic hammer. Several challenges had to be mastered at the same time: The lubricating oil was not allowed to leak from the inside of the vibrator, nor was a pipe allowed to sink into the sea as a result of a handling error or slip during insertion.
The work was completed on schedule to the great satisfaction of all involved. In a second construction phase, the further expansion of the drilling platform took place - our MS-240 HHF was also used here again.
Data & Facts
you might also be interested in
-
Dresden: protecting the historic heart of the city
As a consequence of the flood disaster, Dresden is reinforcing its flood protection in the areas at risk. Extensive building work was carried out between 2006 and 2011.
To the post -
Pioneering achievement on the high seas
This marks the beginning of a new era in wind energy. The first German wind farm, “alpha ventus”, has been built in 30 meters of water some 45 kilometers north of the island of Borkum.
To the post -
90 seconds for 1 meter of security
The new system is characterized by its fast installation without the need for special training. One meter of safety “grows” every 90 seconds.
To the post