FLOOD PROTECTION FOR THE YUYAO COMMUNITY IN CHINA.

FLOOD PROTECTION FOR THE YUYAO COMMUNITY IN CHINA.

The Five-Year Plan 2016 to 2020 of the Chinese People's Assembly provides, among other things, for improving the quality of life of the citizens. This also concerns flood protection. On this basis, the Yuyao River in the municipality of Yuyao was equipped with mobile flood protection along a length of about 4,700 metres.

A particular challenge was the very short delivery time. In addition, the customer was inexperienced and needed not only technical expertise but also concepts for storage as well as training for the employees. In addition, parts of the production were to take place in China. We commissioned several Chinese and German companies with the production of the approx. 5,000 stop logs and the approx. 1,500 anchor plates. The delivery from Germany was not made by ship, but by rail. The total delivery and production time was about three months.

In addition to the foundation, we also implemented proposals for the storage concept. We also organised on-site training: once for the construction companies to install the system; the other for the team that sets up the flood protection when there is a risk of flooding.


Technische Daten

Facts

Lorem ipsum dolor sit amet
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.
Lorem ipsum dolor sit amet
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.
Lorem ipsum dolor sit amet
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.
Lorem ipsum dolor sit amet
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

you might also be interested in

  • Offshore work in the Juri Korchagin oil field in Russia

    The Juri Korchagin oil field is located in the northern part of the Caspian Sea. There, the Lukoil company wanted to build an ice-resistant drilling platform consisting of two blocks.


    To the post
  • Dike Retrofitting in Michelau

    In total, a flood line of about 1,500 meters was created. The above-ground part was clad by the executing contractor with a lattice wall containing a filling of limestones.


    To the post
  • Brought in ice-cold.

    Two MS-210 HHF and two MS-240 HHF vibratory units were used for driving steel pipes into the permafrost for the port in Western Siberia.


    To the post